Jun 2012 – Man, did this area confuse me. My photos did not capture it at all – both how the river channel went, nor the long stretch of fill between the first tunnel and the new bridge footing I had made. Fixing this necessitated breaking the second tunnel and mountain off, raising everything, and then aligning until it looked right. Had a lot of fun nonetheless though, and enjoyed recreating the fill up to the bridge footing. I then put my (incorrect) girder bridge in, just to see how things would look. Pretty pleased!